MRP-1CEV-1TMU-LR

This patented remotely controlled completion system used in multi-reservoir production (MRP) includes one impulse mechanical double-grip PIM-2F packer and an ESP unit for simultaneous production from two reservoirs through a single tubing string. The completion system provides parameter measurement and flow control coming from the lower reservoir to the section of an ESP.

Applications:

  • For cost reduction in multi-reservoir fields and wells penetrating reservoirs with different properties;
  • For tapping currently inactive reservoirs;
  • For solving problems associated with drawdown pressure limits or negative mutual interference between reservoirs;
  • For simultaneous production from multiple reservoirs with different physicochemical properties, production fluid characteristics, water cuts, gas-oil ratios, bubble-point pressures and temperatures;
  • For possibility to use this completion system with shroud to prevent overheating of ESM.

BENEFITS

  • The entire completion, including controlled electric valves (CEV), is controlled in real time remotely or from Geonik’s control station;
  • Two-way communication to obtain fluid data from Telemetry units (TMU) with P, Q, C, T gauges and precise opening / closing regulation of electrovalves during operation of an ESP from Geonik’s dedicated telemetry system (TMS) or through power or logging cable by personal request*;
  • The completion is run and set in the well in two stages: 1) setting PIM-2F packer system and (2) running CEVs with their TMUs, an ESP unit and their connection to the packer system;
  • Dynamic testing of lower reservoir during ESP operation with recording of pressure build-up curves by shutting in lower reservoir;
  • To change an ESP, the main completion system is retrieved from the well without the lower packer system;
  • To wash downhole pumping equipment by reagent injection from the wellhead, both direct and reverse circulation can be performed;
  • No additional tubing used for production from multi-completion wells with hydraulic valves is required due to ease of installation and high performance of the completion.
Item code Casing string, mm./in. CEV seat diameter,

mm./in.

CEV working pressure,

MPa/psi

Maximum T, /F Shroud diameter, mm Tubing thread diameter,

mm/in.

 Downhole

environment

Nominal diameter Wall thickness TMU w/gauges TMS
MRP-1CEV-1TMU –118 140/5.51 6/0.2 12/0.47; 20/0.78 ⃰ 30/

4351

120/248; 150/302 ⃰ 150/

302

124;125 73/2.87 Oil

Associated gas

Gas Condensate

Natural gas

Formation water

146/5.74 9/0.35
MRP-1CEV-1TMU-120 146/5.74 6,5-10/

0.23-0.39

12/0.47; 20/0.78 ⃰ 30/

4351

120/248; 150/302 ⃰ 150/

302

124;125;128 73/2.87
MRP-1CEV-1TMU-140 168/6.61 8-11/

0.3-0.43

12/0.47; 20/0.78 ⃰ 30/

4351

120/248; 150/302 ⃰ 150/

302

124;125;128;140 73/2.87
178/7 13-15/

0.51-0.59

MRP-1CEV-1TMU-145 168/6.61 7,3-8/

0.27-0.31

12/0.47; 20/0.78 ⃰ 30/

4351

120/248; 150/302 ⃰ 150/

302

124;125;128;140 73/2.87
178/7 11,5-12,7/

0.43-0.47

* by personal request