MRP – 2ESP – 2CEV -2TMU – ST
This patented remotely controlled completion system used in multi-reservoir production (MRP) includes two packers and double-sided ESP unit for simultaneous production from two reservoirs of horizontal side-track (ST) through a single tubing string. The completion system provides separate parameter measurement and flows control coming from reservoirs of side-track’s tail to an ESP intake.
Applications:
- For cost reduction in multi-reservoir fields and wells penetrating reservoirs with different properties;
- For tapping currently inactive reservoirs;
- For solving problems associated with drawdown pressure limits or negative mutual interference between reservoirs;
- For simultaneous production from multiple reservoirs with different physicochemical properties, production fluid characteristics, water cuts, gas-oil ratios, bubble-point pressures and temperatures.
BENEFITS
- The entire completion, including controlled electric valves (CEV), is controlled in real time remotely or from Geonik’s control station;
- Two-way communication to obtain fluid data from Telemetry units (TMU) with P, Q, C, T gauges and precise opening and closing regulation of electrovalves during operation of an ESP from Geonik’s dedicated telemetry system (TMS) or through power or logging cable by personal request*;
- Dynamic testing of each reservoir during ESP operation with recording of pressure build-up curves by shutting in one of the reservoirs;
- The completion is run and set in the well in two stages: 1) setting two-packers system into the side-track’s tail and (2) running an ESP unit with CEVs and TMUs and its connection to two-packers system;
- Real-time management of each reservoir using downhole gauge and flow-meter data from CEVs and TMUs;
- To change an ESP, the main system is retrieved from the well without the packer system;
- To wash downhole pumping equipment by reagent injection from the wellhead, both direct and reverse circulation can be performed;
- No additional tubing used for production from multi-completion wells with hydraulic valves is required due to ease of installation and high performance of the completion system.
Item code | Casing string, mm./in. | CEV seat diameter,
mm./in. |
CEV working pressure,
MPa/psi |
Maximum T, ℃/F | Tubing thread diameter,
mm/in |
Downhole environment | ||
Nominal diameter | Wall thickness | TMU w/gauges | TMS | |||||
MRP – 2ESP – 2CEVs -2TMUs – ST –118 |
140/5.51 | 6-8/0.2-0.3 | 12/0.47; 20/0.78 ⃰ | 30/
4351 |
120/248; 150/302 ⃰ | 150/302 | 73/2.87 | Oil
Associated gas Gas Condensate Natural gas Formation water |
146/5.74 | 9-11/0.35-0.43 | |||||||
MRP – 2ESP – 2CEVs -2TMUs – ST -120 |
146/5.74 | 6,5-10/
0.23-0.39 |
12/0.47; 20/0.78 ⃰ | 30/
4351 |
120/248; 150/302 ⃰ | 150/302 | 73/2.87 | |
MRP – 2ESP – 2CEVs -2TMUs – ST -140 |
168/6.61 | 8-11/
0.3-0.43 |
12/0.47; 20/0.78 ⃰ | 30/
4351 |
120/248; 150/302 ⃰ | 150/302 | 73/2.87 | |
178/7 | 13-15/
0.51-0.59 |
|||||||
MRP – 2ESP – 2CEVs -2TMUs – ST -145 |
168/6.61 | 7,3-8/
0.27-0.31 |
12/0.47; 20/0.78 ⃰ | 30/
4351 |
120/248; 150/302 ⃰ | 150/302 | 73/2.87 | |
178/7 | 11,5-12,7/
0.43-0.47 |
* by personal request